Power Transmission

The NTDC (National Transmission and Despatch Company) is Pakistan's sole National Grid Company, with transmission network spreading all over the country except areas served by KE. The network includes transmission lines long 8059 km at 500kV and 11503 km at 220kV. 

Key Trends and Figures

Most Recent Breakdown

09 January 2021, NTDC system suffered a major breakdown, plunging Pakistan into darkness.

System Operator

NTDC currently fulfills this role, however; there is an immediate need for an independent SO as legal mandate for NPCC (National Power Control Center-part of NTDC) has expired.

Power Evacuation

Pakistan's first 600kV HVDC transmission line is being constructed for power evacuation from plants in Southern region to Northern load centers. The line is expected to be 886km long, with a capacity of 4000MW.


Loading Position of Power Transformers - NTDC System

Maximum Overloading

60% - August

Minimum Overloading

13% - December

Data Sources

The data is taken from various public sources, and can be subject to alteration. The data is the sole ownership of the original data providing sources. PakESDA takes no responsbility of the content of original data. PakESDA carries out internal vetting process to eliminate, identify and rectify data errors; however the accuracy of data lies with original data providers. For any questions or concerns, feel free to reach out to us. 

state_bank_of_pakistan
OGRA_pakistan
Petroleum_Division_Pakistan
NTDC_Pakistan
nepra_pakistan
ministry_of_finance